The ABAA Blower Door Training program is a 40-hour program delivered over 5 days by industry experts and representatives from both blower door manufacturers. The purpose is to educate both entry-level and experienced blower door technicians in the planning, preparation, and execution of a blower door airtightness test on commercial and large
Testing shall be conducted in accordance with RESNET/ICC 380, ASTM E779 or ASTM E1827 and reported at a pressure of 0.2-inch w.g. (50 pascals.) Where required by the building official, testing shall be conducted by an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided
Testing in Windy Weather Blower Door Fan Calibration ⢠Flow Conversion Tables: Flow CFM ⢠Flow Conversion Tables: Rings D and E ⢠Air Density Correction Factors: Depressurization and Pressurization Blower Door System Maintenance Specifications OTHER RESOURCES 21 Software Information Instructional Videos Additional Guides
Until recently, most blower door testing was performed on small non-residential and residential structures. However, there is now a demand for consultants with the knowledge and equipment necessary to test large facilities, usually using multiple-fan blower door systems.
Blower-Door-Test: Messung, Werte und Kosten. Ein Blower-Door-Test dient dazu, die Luftdichtheit eines Gebäudes zu messen und Luftundichtigkeiten in der Gebäudehßlle zu erkennen. Seitdem das Gebäudeenergiegesetz (GEG) im November 2020 in Kraft getreten ist, gelten geänderte Vorgaben beim. Blower-Door-Test bei der Messung der Luftdichtheit.
. 292 58 425 63 104 32 326 189
blower door test equipment price